English | Spanish | Dutch
Log in

Results for "Mumbai metro line 3"

Blogs

    • LS@boreastunnelling.com

      Open-Plant

      For your TBM or other PLANT this software is crucial in regards to make the most of t...https://www.open-plant.com Thai Cell:     +66 81 963 1982 LINE:     ...

      • LS@boreastunnelling.com

        Open-Plant

        For your TBM or other PLANT this software is crucial in regards to make the most of t...https://www.open-plant.com Thai Cell:     +66 81 963 1982 LINE:     ...

        • SchmidtTBMSystem

          AVN3200 Pipejacking machine tested 10/1-24.

          AVN3200 + additional material to facilitate a 500m drive....heels for soft ground, # Central drive unit with splined shaft for reliable, heavy-du...e-controlled. Cutting Wheel linie 200 mm, Discharge line 200 mm, By-pass Line  20...

          • Martin Sirzo

            World Tunnel Congress in Copenhagen is now officially WTC2022

              It has been confirmed by the Danish Society for Tunnels and Undergroun...ew projects are well under construction and site visits will be arranged. New Metro lines (Cityringen, Nordhavn and Sy...

            • Billy Gundry

              Tunnel Training

              There are thousands of tunnels in the UK, with more being built each year. The majori...videnced by projects such as the Crossrail Program to deliver the new Elizabeth line in London - tunnel operators...