Results for "NepalBheriBabaiDiversionMultipurposeProject"
Wall posts
#NepalBheri-Babaiproject to issue 49pc shares to public.
#China Engin...ine in April last year, ahead of its projected schedule for diverting water from the Bheri River to the Babai River...tps://thehimalayantimes.com/business/bheri-babai-project-to-issue-49pc-shares-to-publi...
Foundation stone for #Nepal dam, powerhouse of Bheri-Babai laid
The project aims at diverting the waters of Bheri River to Babai River for irrigation purpo...work.com/news/foundation-stone-for-dam-powerhouse-of-bheri-babai-laid/
Locals threatento obstruct Bheri-Babai works.
Locals had to start the protest as the project office failed to live up to its commitment that it had made when the project commenced.
https://myrepublica.nagariknetwork.com/news/locals-threatento-obstruct-bheri-babai-works/
#NEPAL
KATHMANDU: The Province 3 government to invest in...tioned the tunnel construction as the pride project i...government.
https://thehimalayantimes.com/nepal/provin...-on-hetauda-kathmandu-tunnel-construction/
#Nepal #tunnels
There is much interest in tunnels in Nepal. But #Nepal's first tunnel was built as early as in 1917 and with Nepalese tec...resources, and is still in good condition.
https://www.nepalit...
The Karot power project is on the Jhelum River in...neration task hydropower complex, the project’s structure lay...rock fill dam, spillway, powerhouse, diversion tunnels, head race power tu...https://pakobserver.net/a-milestone-project-under-cpec-karot-bridge-in-aj...
Earlier, #tunnel ways had been constructed in #Nepal, but they were either for hydropower or drinking water projects. This will be the first for the operation of vehicles
The project to be implemented by a loan b...
Tunnel work in Melamchi Water Supply Project nears final phase
Work by Chinese company Sino Hydro Pvt Limited has only 400 metres of finishing work
https://myrepublica.nagariknetwork.com/news/tunnel-work-in-melamchi-water-supply-project-nears-final-phase/
#Nepal
Nepal shortlist #China Railway Eryuan Engineering Group (CREEG) for a project with 22.2 km of #tunnel. Tunnel part of 76.2-kilometre-long Kathmandu-Tarai Fast Track expressway.
https://thehimalayantime...
Chinese technical team arrives in Nepal to conduct a preliminary assessment of the Tokha-Chhahare-Gu...Rasuwagadhi.
https://english.onlinekhabar.com/chinese-technical-team-arrives-in-nepal-t...