It is a Robbins Double Shield with a diameter of 5,06 meters.
It is reported that it bored 12,2 km in 18 months `8 months ahead of schedule' and with a progress of '1.000 m per month' (this is what Robbins says).
China’s Slurry Tunnel Boring Machine (TBM) is being transported to Bangladesh as part of the Karnaphuli river tunnel project which is being constructed by China Communications Construction. The diameter of the TBM is 12.12 meters, length is 94...
Welcome to the surface! E-BERK's TBM with E-BERK Cutting Tools breaks out to the daylight after a 4716m long, 4,98m diameter tunnelling.
DSİ Pamukluk Dam water conveyance project. Mersin, in the Mediterrenean cost of Türkiye.
The Herrenknecht company specializes in tunnel-boring equipment. Three of its enormous drilling machines tare in Mexico to solve an equally massive problem: the inadequate drainage and wastewater system of Mexico City. The Mexican government is...
The Herrenknecht company specializes in tunnel-boring equipment. Last year, it sold three of its enormous drilling machines to Mexico, where they are to help solve an equally massive problem: the inadequate drainage and wastewater system of Mexico...
Tunnelling for Australia’s biggest public transport project is about 50 per cent complete after another mega boring machine broke through into the new Crows Nest Station site.
Only four weeks after Tunnel Boring Machine (TBM) Wendy arrived, TBM...