English | Spanish | Dutch
Log in

15.07m Diameter Cutter Head TBM for First Anhui River Tunnel lowerd

    Chu Yang
    By Chu Yang

    Peoples Daily Online, inform in July 18, 15.07m cutter head lowerd for "First Anhui River Tunnel"-Wuhu City South Crossing River Tunnel construction.

    Project 5.96 kilometer long. TBM work on 3.95 kilometers. Tunnel inner diameter of 13.3 meters. Outer diameter 14.5 meters.

    http://ah.people.com.cn/BIG5/n2/2021/0718/c227131-34825863.html

    image

    image