English | Spanish | Dutch
Log in

Singapore: Cross Island Line (tunnels): Environmental impact can be ‘adequately managed’ for both alignment options being considered, study finds

 

The environmental impact of the two underground alignment options for the Cross Island Line (CRL) can be “adequately managed” with comprehensive mitigating measures and monitoring plans.

Read more at https://www.todayonline.com/singapore/cross-island-line-environmental-impact-can-be-adequately-managed-both-alignment-options

alternative reporting on Straits Times:

The future Cross Island MRT line that will run from Tuas to Changi can either run under the Central Catchment Nature Reserve or go around it.

https://www.straitstimes.com/singapore/transport/feasible-for-cross-island-line-to-run-through-central-catchment-or-skirt-around

 

image

image