English | Spanish | Dutch
Log in

Patel Engineering executes fastest tunnelling in MCGM water tunnel project for BMC, Mumbai

    A. Luthra
    By A. Luthra

    Patel Engineering Limted (PEL) used 3.2 metre diameter Tunnel Boring Machine to bore tunnel for Brihanmumbai Municipal Corporation (BMC).

    Patel Engineering completed 3km of 5,5 water tunnel reports Construction Week.

    https://www.constructionweekonline.in/projects-tenders/bmc-executes-fastest-tunnelling-in-mcgm-water-tunnel-project-mumbai

    image

    image