English | Spanish | Dutch
Log in

7.98 meter CRCH TBM work for Macau LRT Hengqin submarine tunnel

    Chu Yang
    By Chu Yang

    Construction start for 900-meter submarine tunnel under Shizimen channel. Outer tunnel diameter 7.7 meter. Inner diameter 7 meter. China Railway Construction Heavy Industry has designed and produced special Earth Pressure Balance EPB Tunnel Boring Machine in in Changsha, Hunan. Diameter of EPB TBM is 7.98 metre.

    https://www.macaubusiness.com/lrt-extension-to-hengqin-initiates-tunnel-boring-works/

    image

    image