English | Spanish | Dutch
Log in

Excavation of the new Kerak Tunnel completed on the Trans-Siberian Railway

    Bogdan A. Dašić
    By Bogdan A. Dašić

     

    The new Kerak tunnel on the Kovali-Ulruchi section (Amur Region) on the Trans-Siberian Railway has been excavated. The new double-track tunnel runs parallel to the one constructed in 1910 and it is 926 meters.

    General Director - Chairman of the Board of Russian Railways Oleg Belozerov has thanked the builders for excavating the tunnel in just 11 months.

    https://ampravda.ru/2022/06/21/0113602.html

    image

    image