İşin iyi yanı, İTÜ bu çalışmayı, Başyukarı Delme (Raise Boring) konusunda uzman Türk kuruluşu Sargın Yapı ile Devlet Su İşleri ile ortak hazırlamış.
Yazı Tunnelling and Underground Space Technology dergisinin Eylül 2022 sayısında yayınlanıyor.
Full-Scale linear cutting tests using a button cutter and deterministic performance prediction modeling for raise boring machines
Aydın Shaterpour-Mamaghani a, Hanifi Çopur a, Arif Gümüş a, Deniz Tumaç a, Cemal Balcı a,
Tayfun Erdoğan b, Engin Doğan c, Ayhan Koçbay d
a Mining Engineering Department, Istanbul Technical University, 34469 Maslak, Istanbul, Turkey
b Sargin Construction and Machinery Industry Trade Inc., Ankara, Turkey
c Mining Engineer, Istanbul, Turkey
d General Directorate of State Hydraulic Works, Ankara, Turkey
https://www.sciencedirect.com/science/article/abs/pii/S0886779822002498#!
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com