On July 19, 2023, the Φ9.68m dual mode TBM, designed and manufactured by China Railway Engineering Equipment Group Co., Ltd. (CREG) for the Fortezza-Ponte Gardena railway section extending from Brenner Base Tunnel, passed its factory acceptance test in Zhengzhou.
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com