The Incheon City Waterworks Division announced that it will begin excavation work using Tunnel Boring Machine. Tunneling is in 59.6m depth, 2.54km long and 3m diameter for water tunnel.
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com