English | Spanish | Dutch
Log in

Breakthrough of 3.2 km long tunnel between Katra-Reasi Stations achieved

    Ansh Chaturvedi
    By Ansh Chaturvedi

    With the breakthrough of 3209 meter long Tunnel T-1 between Katra and Reasi Stations, another milestone has been achieved under the Udhampur-Srinagar-Baramulla Rail Link (USBRL) Project,

    https://www.dailyexcelsior.com/breakthrough-of-3-2-km-long-tunnel-between-katra-reasi-stations-achieved/

    image

    image