English | Spanish | Dutch
Log in

Canada: Eglinton Crosstown West Extension tunnel boring machine breaks through

    Matt J. Scott
    By Matt J. Scott

    Rexy, one of two twin tunnel boring machines excavating the tunnels for the western underground segment of the route, has reached its destination.

    The 750-tonne, 131-metre long machine has broken through the final wall and emerged from the tunnel at the Scarlett Road extraction shaft, where the tunnel boring machines will be disassembled and removed from the ground.

    Eglinton Crosstown West Extension

    (also the map) https://www.metrolinx.com/en/news/eglinton-crosstown-west-extension-tunnel-boring-machine-reaches-finish-line

    Null

    image

    image