Rexy, one of two twin tunnel boring machines excavating the tunnels for the western underground segment of the route, has reached its destination.
The 750-tonne, 131-metre long machine has broken through the final wall and emerged from the tunnel at the Scarlett Road extraction shaft, where the tunnel boring machines will be disassembled and removed from the ground.
(also the map) https://www.metrolinx.com/en/news/eglinton-crosstown-west-extension-tunnel-boring-machine-reaches-finish-line
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com