Rishi Sunak had pledged last year that the cost of the 4.5-mile tunnel would be covered by the private sector
https://www.standard.co.uk/news/transport/sadiq-khan-euston-hs2-station-tunnel-high-speed-railway-government-private-sector-b1156481.html