“La Matucana”, the tunnel boring machine developed by China Railway Construction Corporation (CRCC) has started boring on May 9 at Santiago Metro Line 7.
It is the first time in the history of Chile that the TBM method is used for the construction of a tunnel.
https://dangdai.com.ar/2024/05/09/crcc-construira-una-nueva-linea-de-subte-en-santiago/
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com