A 3D model created using computer-generated imagery software shows how a 2,050-tonne tunnel boring machine (TBM) broke through into an underground reception can filled with foam concrete and installed the 4,217th concrete tunnel ring to complete the 8km stretch of Northolt Tunnel in London.
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com