Kajaran tunnel is going to be about 7 km and reconstruction of the roads approaching the tunnel with a length of about 4 km. Road Department of the Ministry of Territorial Administration and Infrastructure sets deadline for submission of bids as 22 July 2025 at 16:00 on Yerevan (western Asia time).
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com