New Zealand: Auckland starts with below ground investigations for Light Rail
https://vimeo.com/654347369/8cdd77c309 Auckland Light Rail (ALR) starts with ground investigations. In the next six months, ALR will sink 30 holes between 10 to 80 metr...Terratec delivers 4.27-m EPB TBM for the South Bangkok Cable Tunnel Project
Aussie company Terratec delivered a 4.27-m diameter Earth Pressure Balanced Tunnel Boring Machine for a project in Thailand. TERRATEC delivers the new 4.27m dia. EP...Poland: The construction of the CPK High Speed Rail Tunnel In Łódź has begun
CPK has signed the second of three construction contracts for its most advanced railway project. The over 4-kilometre High-Speed Rail tunnel in Łódź is a key el...Victorian Government: Suburban Rail Loop Early Works A Step Closer
Suburban Rail Loop Early Works A Step Closer A staggering seven kilometres of ground – the equivalent of 15 laps around the MCG – ha...HS2 tunnelling machines reach Chalfont St Peter ventilation shaft
Two enormous Tunnel Boring Machines (TBMs) excavating HS2’s longest tunnels have completed the first stage of their drive – from the Chilter...
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com