Terratec TBM for Mithi River Water Quality Improvement Project of Mumbai
Terratec TBM for Mithi River Water Quality Improvement Project of Mumbai Photograph used with courtesy of Terratec co. from :https://terratec.co/NewsInfos/detail/106Freezing method used for excavation by Webuild at Brenner Base Tunnel Isarco River Underpass
Freezing method used for excavation by Webuild at Brenner Base Tunnel Isarco River Underpass https://www.webuildgroup.com/en/media/press-notes/webuild-eisack-underpass-work-completed/Germany: Herrenknecht builds a 17.5-meter mega TBM to cross under the Yellow River in China
Germany: Herrenknecht builds a 17.5-meter mega TBM to cross under the Yellow River in China Released by Herrenknecht with the press release https://www.herrenknecht.com/en/newsroom/pressreleasedetail/mega-project-in-china-175-meter-tbm-shanhe-is-ready-for-construction-site/Brisbane Cross River Rail Tunnel Boring Machines at Herrenknecht's Northside facility in Australia
Brisbane Cross River Rail Tunnel Boring Machines at Herrenknecht's Northside facility in Australia photo: Queensland government press release.Szczecin tunnel Oder river location (from GDDKiA media release)
Szczecin tunnel Oder river location (from GDDKiA media release)
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com