A highway tunnel under construction in southwestern #China has collapses, killing 4 people an...aving another 8 missing.
Water and mud burst from the tunn...com/International/wireStory/dead-missing-southwest-china-tunnel-c...
Foundation stone for #Nepal dam, powerhouse of Bheri-Babai laid
The project aims at diverting the waters of Bheri River to Babai River for irrigation purpose through a 12.2-kilometer #tunnel. Tunnel d...
Brussels: a subsidence in the Quatre Bras tunnel is causing traffic problems.
The subsidence took place...manhole, in the middle of the roadway, just before the tunn.../info/regions/detail_bruxelles-un-affaissement-dans-le-tunnel-d...
Prime Minister Narendra Modi said today that Rohtang tunnel, now rechristened as Atal Tunnel, will change fortunes of the region (inc...as, promote tourism and reduce distance.
https://www.dailyexcelsior.com/tunnel-w...
Final decision on A303 tunnel expected within three months.
The planned 2.1 km (bored) tunnel under the UNESCO World Heritage Site Stonehenge is a source of controversy.
https://www.salisburyjournal.co.uk/news/18136073.final-decision-a303-tunnel-expected-within-three-months/
posted on Tunnel Walk and Talk wall
A last-ditch attempt by Hackney council to suspend the contentious Silvertown Tunnel has been revealed through Freedom of Information (FoI) requests
https://www.londonnewsonline.co.uk/last-ditch-attempt-to-suspend-silvertown-tunnel-project-revealed/
Charlotte is the first of 2 TBS to break through the ground for London’s new super sewer.
It bored the Frogmore Connection Tunnel from Wandsworth to Fulham as part of the Thames Tideway Tunn...bctoday.co.uk/news/planning-construction-news/tunnel-b...
After six years of construction, a tunnel along the Chengdu-Lanzhou high-speed railway was announ...zone of the Longmen Mountains, the 9,913-meter Maoxian Tunn...onstruction.
https://news.cgtn.com/news/2020-01-13/Key-tunnel-d...
A very informative article from highways.today. Very beautiful pictures too.
#Herrenknecht’s...a total of almost 50 kilometers of modern and efficient tunn...]"
Machine / Project Data
S-738/S-746 (#SUSE) – Filder Tunnel
S...
Lötschberg base tunnel was initially opened provisionally after water ingress.
https://www.nzz.ch/schweiz/der-loetschberg-tunnel-wird-nur-provisorisch-geflickt-ld.1549508
#switzerland