Null

English | Spanish | Dutch
Log in

Results for "Świna Gulermak"

Wall posts

    • Chu Yang

      Gulermak-TPL JV commissions second TBM - a #Terratec S79 - in Pune Metro project https://urbantransportnews.com/gulermak-tpl-jv-commissions-second-tbm-s79-in-pune-metro-project/ #China #Tunnel #Technology #HongKong #India

      • Teodor Adamczyk

        Świna Subsea Tunnel in Świnoujście in Poland gets go-ahead https://tunnelcontact.com/discussion/view/5418/swina-subsea-tunnel-in-swinoujscie-in-poland-gets-go-ahead

        • Rohit Agarwal

          Gulermak-TPL JV commissions second TBM S79 in Pune Metro project. https://urbantransportnews.com/gulermak-tpl-jv-commissions-second-tbm-s79-in-pune-metro-project/

          • Erdem Mertoğlu

            İzmir Municipality's Narlıdere metro progress: #Gülermak completes the boring of 860 meter part between 2 stations in 1,5 months. Narlıdere complete length is 7,5km https://www.haberimport.com/izmir-narlidere-metrosunda-iki-istasyon-birlesti-17476.html #izmir #tunnels

            • Ansh Chaturvedi

              Terratec TBM S79 operated by the Gülermak – Tata arrives at Pune Metro’s Agriculture College Shaft on the 16.589 km Line-1 (Purple Line) to record the line’s second brea...

              • Ansh Chaturvedi

                Pune Metro achieves first underground tunnel breakthrough. The tunnel boring machine (TBM) S78 “Mutha” which is being operated by the Gülermak – Tata Projects Limited JV...

                • Teodor Adamczyk

                  The tunnel in Świnoujście will become the second underwater road tunnel in Poland. The tunneling will start as planned in March 2021. A consortium of companies: Porr SA...

                  • Teodor Adamczyk

                    Soon S3 tenders for the tunnel in Świnoujście will be announced reports the respected Polish publication inzynieri...diameter of the tunnel will be 12 m, and external - 13 m). Drilling under the Świna St...