Herrenknecht AVN1200 breakthrough for TENP project in Kehl, Germany
Herrenknecht AVN1200 breakthrough for TENP project in Kehl, Germany from Herrenknecht official media release information at https://www.herrenknecht.com/en/newsroom/pressreleasedetail/breakthrough-on-the-pipeline-construction-site-in-kehl/Terratec TBM for Mithi River Water Quality Improvement Project of Mumbai
Terratec TBM for Mithi River Water Quality Improvement Project of Mumbai Photograph used with courtesy of Terratec co. from :https://terratec.co/NewsInfos/detail/106London's super sewer tunnel project Tideway is complete with the final lid lifted in place
Photo has been released by Tideway (London, United Kingdom) source: https://www.tideway.london/news/press-releases/2024/march/londons-super-sewer-now-fully-built-after-final-lid-lifted-into-place/TERRATEC delivers 3.14m diameter Rock EPB TBM for Mumbai Sewage Disposal Project-Stage II, PST-2
TERRATEC delivers 3.14m diameter Rock EPB TBM for Mumbai Sewage Disposal Project-Stage II, PST-2 https://terratec.co/NewsInfos/detail/117TERRATEC delivers 3.14m diameter Rock EPB TBM for Mumbai Sewage Disposal Project-Stage II, PST-2
TERRATEC delivers 3.14m diameter Rock EPB TBM for Mumbai Sewage Disposal Project-Stage II, PST-2 https://terratec.co/NewsInfos/detail/117
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com