Null

English | Spanish | Dutch
Log in

Results for "T"

Blogs

    • LS@boreastunnelling.com

      Boreas Tunnelling is recruiting a TBM Hydraulic Supervisor

      Boreas Tunnelling is recruiting a TBM Hydraulic Supervisor We are looking for a TBM Hydraulic Supervisor for an esteemed client operating in Australia. Th...draulic Supervisor is assumed to be at the TBM location to en...dings of safety incidents related to the TBM; Attend meetin...

      • SchmidtTBMSystem

        AVN3200 Segmental Lining erector ganries, NEW

        The never-used AVN3200 Segmental lining system comprises 10 Gantries, is still in its original packaging, and goes well with the AVN3200 advertised on this great site. Please contact me for more info and Pix.  

        • SchmidtTBMSystem

          AVN3200 Pipejacking machine tested 10/1-24.

          AVN3200 + additional material to facilitate a 500m drive. Tunnelling Machine AVN3200 SOFT GROUND  # Articulated s.../ excavated material transportation by slurry. # Slurry fee...h interchangeable nozzle inserts for different nozzle diamete...

          • SchmidtTBMSystem

            Jack Up barge 39.6 * 42.75 * 25.5. Max water dept 26m. MNax Load 1080T.

            Jack Up barge for sale in BKK area, Thailand, Kindly contact me for more information and availability and such.. The 350T Crawler Crane is NOT included; it is sold separately.