Most shameful. Only 2 months after contractors finished it.
https://www.freepressjournal.in/mumbai/mumbai-leaks-in-newly-opened-coastal-road-tunnel-raise-safety-concerns
The Mumbai Metropolitan Region Development Authority (MMRDA) has commenced the geotechnical investigation work for the proposed underground Orange Gate Road Tunnel...
https://www.youtube.com/watch?v=FllcJfR1t2c
The new Coastal Road Tunnels of Mumbai is already leaking water! Just such a short period after they opened to traffic!
I can not believe...
Afcons Infrastructure—Sam India Consortium tunnel boring machine Shivaji (a Herrenknecht EPB TBM of model S-718C and diameter 6.63 meter) achieved a breakthrough at RBS College Station for the Agra Metro Phase 1 project after a 734 meters...
https://www.youtube.com/watch?v=dvIic_uQ38Q
Border Roads Organisation (BRO) has reached to an important milestone in the construction of the Sungal Tunnel on National Highway-144A connecting Akhnoor with...
Afcons Infrastructure - Sam India Consortium's TBM Progresses Rapidly
https://www.metrorailnews.in/tbm-s115-achieves-breakthrough-at-rbs-college-for-agra-metro-phase-1/
Arnold Dix slid his hand into a gap in the rock at the entrance to a tunnel where 41 men were trapped alive, put his back against the cold stone and listened, and felt, and listened some...
The PWD has finished repairs and renovation work for the brand new tunnel which kept clogging whenever it rained.
https://www.timesnownews.com/delhi/delhi-built-2-years-ago-pragati-maidan-tunnel-fit-for-traffic-again-article-109473407
Chief Minister Thakur Sukhwinder Singh Sukhu has said that due to the efforts of the state government, the way for construction of Shinkula Tunnel has been...
The tunneling process will begin from Khidderpore and continue till Victoria (Memorial) station, with Tunnel Boring Machine (TBM) operations commencing from the premises of St. Thomas...
With 6610 meters, this will be the longest tunnel in the 82,5 kilometer long Dimapur - Kohima New Rail Line. The railway line will have 21 tunnels of total length 31 km, in addition to many other structures like bridges...
Hyperloop pioneers Swisspod Technologies (Switzerland), and TuTr Hyperloop (India) have come together with the governments of Switzerland and India to sign a Memorandum of Understanding (MoU) aimed at advancing sustainable, high-speed transportation...
After 3 months of its launch, Chennai Metro Rail Limited (CMRL) Tunnel Boring Machine (TBM) ‘Kaveri’ has successfully tunneled under Adyar River and going towards the Adyar Junction Metro...
Tunnel science paper from IIT Indore.
Numerical Analysis of Underground Tunnel System with GFRP Shield Against Internal Explosion
March 2024
Part of the book series: Springer Proceedings in Materials ((SPM,volume 35))
Authors:
Anshul Kaushik,...
TERRATEC is pleased to announce the delivery of a 3.14m Rock EPB Tunnel Boring Machine for the Mumbai Sewer Disposal Project (MSDP) Stage-II – PST2 in Mumbai, India by J Kumar and Michigan Engineers Private Ltd. (MEPL) Joint Venture for client...
The board near the Mumbai Coastal Road Tunnel entrance was falsely boasting “You are entering India’s first undersea tunnel. Built by L&T”.
This was despite the fact that the tunnel was not an undersea tunnel but...