'Ashwini Bhide, the IAS officer who led the project, takes us to gound zero'
https://www.hindustantimes.com/cities/mumbai-news/mumbai-metro-3-breaking-ground-defying-odds-101728762856009.html
The Delhi Metro Rail Corporation (DMRC) completed the underground tunnel between Chhatarpur and Chhatarpur Mandir station in Phase 4 of Golden Line on Saturday, officials...
All Indian lineup with Afcons, ITD, HCC, Larsen & Toubro, Tata :
https://metrorailnews.in/patna-metro-received-bids-from-5-firms-for-an-underground-contract/
Welspun Enterprises gets Rs 1,989 cr design and build contract in Mumbai Welspun Enterprises secures a Rs 1,989 crore contract from BMC for designing and building a tertiary treated water conveyance tunnel using TBM, to span from Dharavi to...
After a meeting with Roads & Buildings Minister Komatireddy Venkat Reddy, Robbins agreed to provide main bearings and other sparesfor completion of Srisailam Left Bank Canal (SLBC)...
"1) Candidate shall have experience in handling overall responsibilities for Tunneling activities of similar large scale construction projects (preferably UG Metro Project / Tunnel Projects). 2) Candidate shall have good knowledge of...
" Candidate shall have good knowledge of TBM operations and Tunnel construction using TBM."
https://larsentoubrocareers.peoplestrong.com/job/detail/LNT_TM_1009182
"Must have experience of executing Rock TBM Tunnelling / NATM of minimum 4.5km length through single Tunnel having minimum finished inner diameter of 7.0m Must have good knowledge & experience in NATM tunneling...
" highly qualified and experienced TBM Civil Manager to join our team. As a TBM Civil Manager, who will be responsible for designing, planning, and overseeing the construction of tunnels using Tunnel Boring Machines...
"Bachelor’s or Master’s degree in Civil Engineering or related field and extensive experience (usually 8-12 years) in tunneling and underground construction, with a strong focus on NATM...
UP Metro Rail Corporation Limited (UPMRC) has launched the TBM 'Vidyarthi’ to construct a tunnel on the ‘downline’ on a 2.40 km stretch (Swadeshi Cotton Mill-Kanpur Central) of Corridor-1 (IIT-Naubasta) of the Kanpur...
https://www.youtube.com/watch?v=SrXvK8dYDMo
Two TBMs boring in parallel have emerged after "covering a length of approximately 2997 metres, at an average rate of 8.2 metres per tunnel per day".
They were operated by Afcons...
For its second assignment, TBM S115 constructed a 684m tunnel from RBS college station to Raja ki mandi station ...
https://metrorailnews.in/agra-metro-tbm-s115s-breakthrough/
The residents allege that ongoing drilling for the Kolkata Metro Rail Corporation (KMRCL) in the east-west Metro corridor is to blame for the cracks and water leakages in their...
Tunnelling on one of the toughest stretches of CMRL phase-two between Kolathur junction and Villivakkam MTH Road metro (earlier Nadhamuni metro), covering...