English | Spanish | Dutch
Log in

Ceneri Base Tunnel construction nearing completion

    Roberto Calvi
    By Roberto Calvi Replies (9)

    Ceneri Base Tunnel and Gotthard Base Tunnel maps

    Everybody talks about Gotthard Base Tunnel. But also under the Swiss Alps another huge tunnel is being constructed: Ceneri Base Tunnel in the Italian part of Switzerland.

    Facts:

    • Connects north and south of Ticino in Switzerland under Mount Ceneri (part of Swiss Alps)
    • High Speed Railway tunnel for speeds up to 250km/h.
    • Twin tube (each single track) tunnel with each tube 15.4 km long (or to be exact: the lengths of the east tube is 15.45km& the west tube is 15.28km).
    • Each tube is separated by 40 meters from each other. And at every 325 meters connected by cross passage tubes.
    • Main excavation method : Drill & Blast. Only for the 2.4km long adit tunnel, a main beam tunnel boring machine used from The Robbins Company (it bores at a rate of 18.5 meter per day)
    • It will be feeding train traffic to the Gotthard Base Tunnel.
    • It is a really deep tunnel: Around 2440 meters below the peak of the mountain.
    • Geology: Hard Rock
    • Project owner: AlpTransit Gotthard AG
    • Around 1000 people work on the project.
    • To be inaugurated in September 2020, 28 years after first gelological surveys carried out.

    Swiss government site:

    https://www.alptransit-portal.ch/en/overview/construction/events/ereignis/ceneri-the-third-base-tunnel/

    image

    image