On May 26, builders from the construction of the third Bureau in Wuhan Metro Line 8 phase II construction site to intensify construction in China.
http://big5.xinhuanet.com/gate/big5/www.hb.xinhuanet.com/2020-05/27/c_1126036974.htm
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
On May 26, builders from the construction of the third Bureau in Wuhan Metro Line 8 phase II construction site to intensify construction in China.
http://big5.xinhuanet.com/gate/big5/www.hb.xinhuanet.com/2020-05/27/c_1126036974.htm
武漢地鐵8號線二期項目穩步推進_新華湖北
big5.xinhuanet.com5月26日,來自中建三局的建設者在武漢地鐵8號線二期建設現場加緊施工。