English | Spanish | Dutch
Log in

Amsterdam decides against the tunnel between A8 and A9

There were several tunnel alternatives to connect A8 and A9 roads. One of the proposed tunnels was 2.5 kilometres long. Province decides that because of `legal and technical reasons' the tunnel options are not doable.

https://www.noordhollandsdagblad.nl/cnt/dmf20200529_27305591/verbindingsweg-a8-a9-kan-niet-per-tunnel-onder-stelling-van-amsterdam-door

image

image