Null

English | Dutch | Spanish

Construction of another tunnel for Moscow Metro started in the east of Big Circle Line

Московские центральные диаметры (МЦД) - Moscow Central Diameters

Between the stations Nizhegorodskaya and Tekstilshchiki on the eastern section of the Big Circle Metro Line a new tunnel is being built. TBM Svetlana will bore375 meter long at a depts of 11-22 meters.

The construction of the Big Circle Metro Line should be finished in 2023.

https://realty.ria.ru/20200731/1575214830.html

Null

Null