Highways England has announced on its website that they will be launching today (11/11/2020) a tender for the construction of the 2 bored tunnels each with a length of 2.6 miles (4.2 km). The £2bn tender will be launched by Lower Thames Crossing executive director Matt Palmer.
Highway England says " The Lower Thames Crossing will improve journeys by almost doubling road capacity across the Thames east of London with 14.3 miles of new road featuring two 2.6 mile-long tunnels. Works on the project could start in about 18 months and would provide a huge jobs boost to the UK infrastructure industry" adding that " At 16 metres wide, these tunnels will be some of the largest bored tunnels in the world. They will also be the longest road tunnels in the UK".
Highway England gives the following information about the package:
image (The route of Highways England's Lower Thames Crossing) is from: ClemRutter, CC BY-SA 4.0, via Wikimedia Commons.
New Civil Engineer writes that "Lower Thames Crossing executive director Matt Palmer will announce the start of procurement on the design and build contract later today (Nov 11) at NCE’s Future of Transport conference"
Highways England will launch its £2bn tunnelling contract for the Lower Thames Crossing today. Lower Thames Crossing executive director Matt Palmer will
Highways England withdraws DCO application for Lower Thames Crossing Project to avoid a certain rejection
The Networking Site for Tunnel and Underground Space Professionals
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
https://highwaysengland.co.uk/our-work/lower-thames-crossing/latest-news/search-for-partner-to-build-britain-s-longest-road-tunnel-begins/
Lower Thames Crossing - Latest news - Search for partner to build Britain’s longest road tunnel, begins - Highways England
highwaysengland.co.ukLower Thames Crossing - Latest news - Search for partner to build Britain’s longest road tunnel, begins