Pittsfield has a potentially disastrous problem in the making involving the sewer running bellow the roads, writes The Sun Times News. Sort of time bomb before the sewer tunnels gives in taking in the road users over it.
According to the report, it is not possible to rescue the existing tunnel. A new one needs to the built. It will cost $30m.
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
https://thesuntimesnews.com/g/saline-mi/n/24054/over-100-million-be-spent-two-massive-projects-pittsfield-township-over-next
Over $100 Million To Be Spent On Two Massive Projects In Pittsfield Township Over The Next Two Years
thesuntimesnews.comFrom rearranging the sewage system to tearing down and replacing the bridge carrying Michigan Avenue over US23, Pittsfield Township is going to see some major changes to its infrastructure between here and the end of 2023. The two massive projects...