Afcons has launced another TBM a few days ago in BMRCL to bore from between - South Launching Shaft to Langford Station (North Bound) Total Length of tunnel drive- 2076.334 m.
It is reportedly an S-1259 Herrenknecht TBM made in China.
https://twitter.com/srivasrbmrccoi1/status/1385619882885009409
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
https://twitter.com/srivasrbmrccoi1/status/1385619882885009409