Start target date for Phase 2 Mass Rapid Transit (MRT) for CP 203 package is September 2021. It contains also Mangga Besar tunnel line.
Jakarta MRT Phase 2A is more challenging than in phase 1.
In phase 1, tunneling was not too difficult because the urban structure was more modern and organized. While in phase 2A, route will pass through a cultural heritage buildings.
https://republika.co.id/berita/qtuwfo484/temuan-artefak-dalam-pembangunan-mrt-jakarta-fase-2a
MRT bersama UI dan ITB menggali di kawasan Monas, Kebon Sirih, dan MH Thamrin.
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
https://metro.sindonews.com/read/371290/171/mrt-fase-2-jalur-terowongan-mangga-besar-kota-dimulai-september-2021-1616288602
MRT Fase 2 Jalur Terowongan Mangga Besar-Kota Dimulai September 2021
metro.sindonews.comPembangunan Mass Rapid Transit (MRT) Fase II untuk paket CP 203 yang terdiri dari jalur terowongan Mangga Besar menuju Kota ditargetkan mulai pada September 2021....