English | Spanish | Dutch
Log in

West Gate Tunnel project faces $4b blowout amid contaminated soil crisis

    Robert Storman
    By Robert Storman Replies (1)

    West Gate Tunnel project faces $4b blowout amid contaminated soil crisis

    The tolling giant Transurban building the West Gate Tunnel claims the cost of the project has blown out by a further $1 billion to a total of $11 billion, more than double the original estimate.

    https://www.theage.com.au/national/victoria/west-gate-tunnel-project-faces-4b-blowout-amid-contaminated-soil-crisis-20210615-p5812g.html

    image

    image