English | Spanish | Dutch
Log in

Shenzhen Luohu Chunfeng Tunnel Construction Advances Rapidly

    Chu Yang
    By Chu Yang Replies (1)

    Chunfeng Tunnel is Shenzhen's first single-hole and double-layer shield-based motor vehicle tunnel. Tunnel Boring Machine work under 30 meter ground. CREC already 1745 meter excavate with CREG Tunnel Boring Machine (CREG TBM). TBM is 6 story high.

    China's biggest slurry TBM. This CREG TBM 15.8 meter diameter. Manufactured China Railway Equipment Group (CREG). CREG is subsidiary of CREC.

    http://sz.people.com.cn/BIG5/n2/2022/0413/c202846-35220261.html

    image

    image