In Peru, Delia, the Tunnel Boring Machine that is burrowing through the subsoil of Lima, has reached the Nicolas Ayllon E17 station.
La TBM Delia che scava il sottosuolo di Lima ha raggiunto la stazione di Nicolas Avyllon E17 della nuova linea 2.
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
www.youtube.com