In a release issued on Friday, the civic body said work on the 1,000 metre stretch of the second tunnel of the Coastal Road has been completed
https://www.freepressjournal.in/mumbai/mumbai-50-work-on-second-tunnel-of-coastal-road-completed-says-bmc
In a release issued on Friday, the civic body said work on the 1,000 metre stretch of the second tunnel of the Coastal Road has been completed.
https://www.freepressjournal.in/mumbai/mumbai-50-work-on-second-tunnel-of-coastal-road-completed-says-bmc
Mumbai: 50% work on second tunnel of Coastal Road completed, says BMC
www.freepressjournal.inIn a release issued on Friday, the civic body said work on the 1,000 metre stretch of the second tunnel of the Coastal Road has been completed.