This project has total 52 km of water tunnels. After the tunnel collapse, the hydropower system has been shut down.
M/s China Gezhouba Group Company (CGGC), the contractor for the construction of civil works has been called for the fix.
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
https://www.thenews.com.pk/print/1012157-non-operational-neelum-jhelum-hydropower-project-tunnel-collapse-causes-total-damage-of-rs22-5bn
Non-operational Neelum Jhelum Hydropower project : Tunnel collapse causes total damage of Rs22.5bn | Top Story | thenews.com.pk
www.thenews.com.pkISLAMABAD: The 969 MW Neelum-Jehlum hydropower project, which is non-operational since July 6, 2022 in the wake of blockage that appeared in the 3.5 kms Tail Race Tunnel , has seen an estimated...