Bane Nor’s 22 km Follobanen high speed line between Oslo and Ski was officially opened by King Harald V on December 12, the day after the start of revenue operations with the annual European timetable change.
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
https://www.railwaygazette.com/infrastructure/king-opens-norways-longest-railway-tunnel/63158.article
King opens Norway’s longest railway tunnel
www.railwaygazette.comNORWAY: Bane Nor’s 22 km Follobanen high speed line between Oslo and Ski was officially opened by King Harald V on December 12, the day after the start of revenue operations with the annual European timetable change.