The Government of Sevastopol entered into a contract with the Krasnodar company Vesta to “carry out design and survey work on the facility“ Construction of the tunnel and the reconstruction of the 67 N-256 highway st. General Petrov. Length 254 metres.
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
https://www.crimea.kp.ru/online/news/5244201/
В Севастополе построят автомобильный тоннель - KP.RU
www.crimea.kp.ruОн должен разгрузить центральные улицы города