English | Spanish | Dutch
Log in

Santa Clara BART Construction Preparation Underway

    Adrian Olmex
    By Adrian Olmex Replies (1)

    Crews are preparing the yard for the arrival of the Tunnel Boring Machine (to bore the 5-mile stretch between Santa Clara and Diridon Station).

    https://www.svvoice.com/santa-clara-bart-construction-preparation-underway/

     

    image

    image