Contractor China Railway 24th Bureau complete Loquat Rock No. 1 Tunnel. China Railway Construction Co., Ltd inform. It is first tunnel of 47 km Chongqing section of Xiyu High-speed Railway. In this section 14 tunnels and 31 bridges.
Completed tunnel is one tube one track. "Tunnel is flush with three tunnels of Huilongba Tunnel and Beizhongliangshan Tunnel under construction, with a minimum distance of 2.5 meters between adjacent tunnels"write Xinhuanet.
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
http://big5.news.cn/gate/big5/www.xinhuanet.com/fortune/20240403/ee349f2c15bb4b169d00aa9fad39b5ee/c.html
西渝高鐵重慶樞紐段首座隧道貫通-新華網
big5.news.cn西渝高鐵重慶樞紐段首座隧道貫通-