Not all goes fine at Scarborough subway extension tunnelling by Strabag;
At Metrolinx board meeting's public session on Thursday, Phil Verster said over the $757-million advance tunnel contract: “We’ve encountered soil conditions different than expected that have hampered the progress of the tunnel-boring machine”
https://toronto.citynews.ca/2024/11/29/scarborough-subway-extension-tunneling-soil-conditions/
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
www.youtube.com