The mountain sections progress slow.. The construction of eight tunnels is still in the design phase, although 3 years have passed since the contracts,
https://substantial.ro/autostrada-sibiu-pitesti-progrese-si-provocari-la-constructia-noua/
Major delays on Lot 2 of the Sibiu - Pitești highway. The tunnels will not be ready in time.
Section 2 is 31.33 km and includes 7 tunnels and about 50 bridges and viaducts.
`However, progress is slowed down by delays in completing geotechnical studies and authorizing works.`
It is built with Mapa-Cengiz.
Asociația Pro Infrastructura trage un semnal de alarmă cu privire la ritmul lent al lucrărilor pe Secțiunea 2 a autostrăzii A1 Sibiu-Pitești, gestionată de
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
https://substantial.ro/autostrada-sibiu-pitesti-progrese-si-provocari-la-constructia-noua/
Autostrada Sibiu-Pitești: Progrese și Provocări la Construcția Nouă
substantial.roProgresul pe autostrada Sibiu-Pitești continuă cu speranțe mari pentru noi deschideri. Autoritățile anunță că până la vară ar putea fi finalizați alți 14