English | Spanish | Dutch
Log in

Romania: A8 Motorway tunnel with 7 tunnels and 46 bridges

    I. Stoica
    By I. Stoica Replies (1)

    This 2,69 billion lei (plus VAT) A8 Motorway contract awarded to a partnership of SA&PE Construct s.r.l., Spedition UNM s,r,l,, Tehnostrade s.r.l. and Euro Asfalt (Bosnia Herzegovina) to build this 19,3 kilometer section with 7 tunnels and 46 bridges. Tunnels are short. 7 Tunnels total length 1,44km. It will finish in 48 months of which 12 is for design.

    source

    http://HTTPS://WWW.LIBERTATEA.RO/STIRI/A-FOST-SEMNAT-CONTRACT-NOUA-PORTIUNE-MONTANA-AUTOSTRADA-A8-7-TUNELURI-46-PODURI-5289021

     

     

    Null

    image

    image