Swiss lay the final sleeper in the 2.7 kilometre Bözberg tunnel, the double track freight railway tunnel that does under the Jura mountain to be part of the line connecting the northern European ports and the Mediterranean. It will be operational end-2020.
https://www.railjournal.com/freight/final-sleeper-laid-bozberg-tunnel/
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
https://www.railjournal.com/freight/final-sleeper-laid-bozberg-tunnel/
Final sleeper laid in Bözberg tunnel - International Railway Journal
www.railjournal.comThe final sleeper in the new 2.7km Bözberg tunnel was laid on February 6, a major milestone in the 4m freight corridor project in Switzerland