Moscow's Big Circle Line (BCL) simultaneously launches two tunnel boring machines, each of them with a diameter of 10 meters.
https://tunnelbuilder.com/News/Moscow-Western-Section-Big-Circle-Line-BCL-launches-TBMs.aspx
Moscow's Big Circle Line (BCL) simultaneously launches two tunnel boring machines, each of them with a diameter of 10 meters.
https://tunnelbuilder.com/News/Moscow-Western-Section-Big-Circle-Line-BCL-launches-TBMs.aspx
On 25/02/2020 two TBMs (10 m diameter) were simultaneously launched on the western part of the Big Circle Line (BCL) in Moscow. The TBM
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
Moscow's Big Circle Line (BCL) simultaneously launches two tunnel boring machines, each of them with a diameter of 10 meters.
https://tunnelbuilder.com/News/Moscow-Western-Section-Big-Circle-Line-BCL-launches-TBMs.aspx
Moscow - Western Section, Big Circle Line (BCL) launches TBMs - tunnelbuilder.com News
tunnelbuilder.comOn 25/02/2020 two TBMs (10 m diameter) were simultaneously launched on the western part of the Big Circle Line (BCL) in Moscow. The TBM