English | Spanish | Dutch
Log in

Moscow has desire to build more subways but demand is low, "This puts Meteostroy in difficult financial situation"

    Bogdan A. Dašić

     

    According a Russian publication (I place source link at the bottom) to St. Petersburg Research and Development Institute "Lenmetrogiprotrans" (LMGT) general director Vladimir Maslak said not enough tunnelling work in Moscow has put Metrostroy is in difficult situation financially.

    He says there is need to preserve such a powerful organization specialized in the construction of the underground. 

    https://www.spb.kp.ru/daily/217165/4265454/

    image

    image