Comparison of predicted and actual states in tunnels: Lessons to be learned from the Gerede Water Transmission Tunnel (Turkey)

    Engin Ünverdi
    By Engin Ünverdi

    This is about the GEREDE tunnel in Western Turkey. It is a water tunnel 5,5m diameter. 31.6km long.

    The Gerede tunnel that the ITA-AITES Awards conveniently ignored in their awards.

    Gerede is in a very challenging geology. Gerede tunnel construction 'had to overcome a total of 48 major fault zones and water pressure build ups of up to 26 bar.'

    This academic paper is over the Gerede Tunnel.

    Comparison of predicted and actual states in tunnels: Lessons to be learned from the Gerede Water Transmission Tunnel (Turkey)

    Ahmet Apaydin - Department of Civil Engineering, Giresun University, 28200 Giresun,Turkey

    Quarterly Journal of Engineering Geology and Hydrogeology (2020)

    https://pubs.geoscienceworld.org/qjegh/article-abstract/doi/10.1144/qjegh2020-060/589707/Comparison-of-predicted-and-actual-states-in?redirectedFrom=fulltext

     