4D construction planning has delivered £1m in savings on the eastern section of the Thames #Tideway Tunnel, part of the UK’s largest-ever water infrastructure project.
https://www.pbctoday.co.uk/news/bim-news/construction-planning-in-4d/68410/
#TidewayTunnel #ThamesTideway
4D construction planning has delivered £1m in savings on the eastern section of the Thames Tideway Tunnel, part of the water infrastructure project
#DigitalTwins in #Tunneling - have a look
The differences between BIM in building construction and civil engineering and the use of the BIM model in the operating phase as the basis for the creation of a digital twin.
An interview with Lutz Bettels, Vice President, Regional Executive Owner/Operators EMEA with Bentley Systems,
https://www.tunnel-online.info/en/artikel/tunnel__3451684.html
As a practice-oriented, specialized technical journal, tunnel devotes itself to the planning and construction as well as research, technical equipment installation, maintenance and refurbishment of underground structures.
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com